1. Aliverdi, R., Naeni, L. M., & Salehipour, A. (2013). Monitoring Project Duration and Cost in a Construction Project By Applying Statistical Quality Control Charts. International Journal of Project Management, 31(3), 411-423. [
DOI:10.1016/j.ijproman.2012.08.005]
2. Al-Tabtabai, H., Kartam, N., Flood, I., & Alex, A. P. (1997). Construction Project Control Using Artificial Neural Networks. AI EDAM, 11(1), 45-57. [
DOI:10.1017/S0890060400001839]
3. Anbari, F. T. (2003). Earned Value Project Management Method and Extensions. Project Management Journal, 34(4), 12-23. [
DOI:10.1177/875697280303400403]
4. Cioffi, D. F. (2006). Designing Project Management: A Scientific Notation and an Improved Formalism for Earned Value Calculations. International Journal of Project Management, 24(2), 136-144. [
DOI:10.1016/j.ijproman.2005.07.003]
5. Colin, J., & Vanhoucke, M. (2014). Setting Tolerance Limits for Statistical Project Control Using Earned Value Management. Omega, 49(1), 107-122. [
DOI:10.1016/j.omega.2014.06.001]
6. Colin, J., & Vanhoucke, M. (2015). Developing a Framework for Statistical Process Control Approaches in Project Management. International Journal of Project Management, 33(6), 1289-1300. [
DOI:10.1016/j.ijproman.2015.03.014]
7. Khamooshi, H., & Golafshani, H. (2014). EDM: Earned Duration Management, A New Approach to Schedule Performance Management and Measurement. International Journal of Project Management, 32(6), 1019-1041. [
DOI:10.1016/j.ijproman.2013.11.002]
8. Kim, E., Wells, W. G., & Duffey, M. R. (2003). A Model for Effective Implementation of Earned Value Management Methodology. International Journal of Project Management, 21(5), 375-382. [
DOI:10.1016/S0263-7863(02)00049-2]
9. Lauras, M., Marques, G., & Gourc, D. (2010). Towards a Multi-Dimensional Project Performance Measurement System. Decision Support Systems, 48(2), 342-353. [
DOI:10.1016/j.dss.2009.09.002]
10. Leu, S. S., & Lin, Y. C. (2008). Project Performance Evaluation Based on Statistical Process Control Techniques. Journal of Construction Engineering and Management, 134(10), 813-819. [
DOI:10.1061/(ASCE)0733-9364(2008)134:10(813)]
11. Lipke, W., & Vaughn, J. (2000). Statistical Process Control Meets Earned Value. CrossTalk: The Journal of Defense Software Engineering, 13(1), 16-28.
12. Lipke, W., Zwikael, O., Henderson, K., & Anbari, F. (2009). Prediction of Project Outcome: The Application of Statistical Methods to Earned Value Management and Earned Schedule Performance Indexes. International Journal of Project Management, 27(4), 400-407. [
DOI:10.1016/j.ijproman.2008.02.009]
13. Naeni, L. M., Shadrokh, S., & Salehipour, A. (2014). A Fuzzy Approach for the Earned Value Management. International Journal of Project Management, 32(4), 709-716. [
DOI:10.1016/j.ijproman.2013.02.002]
14. Navon, R. (2005). Automated Project Performance Control of Construction Projects. Automation in Construction, 14(4), 467-476. [
DOI:10.1016/j.autcon.2004.09.006]
15. اکبری، علیاکبر و صالحیپور، امیر (1391). کنترل آماری شاخصهای عملکرد زمان و هزینه در پروژههای عمرانی، فصلنامه علمی ـ پژوهشی مطالعات مدیریت صنعتی، 10(27)، 161-139.
16. خالدیان، فرنوش و عالمتبریز، اکبر (1394). شبیهسازی شاخصهای عملکرد زمانی پروژه از طریق روش طول زمان کسبشده، سومین کنفرانس بینالمللی پژوهشهای کاربردی در مدیریت و حسابداری.
17. عالمتبریز، اکبر؛ خالدیان، فرنوش و مهدیپور، مصطفی (1395). پیشبینی زمان پروژه از طریق طول زمان کسبشده و مدیریت ریسک. نشریه مدیریت صنعتی، 8(2), 217-240.
18. عالمتبریز، اکبر و محمد رحیمی، علیرضا (1388). رویکردهای مدیریت تولید و عملیات، شرکت چاپ و نشر بازرگانی، تهران.
19. عوضخواه، حسین (1388). مدیریت ریسک پروژه با استفاده از Pertmaster V8، نشر حامی.
20. نورالنسا، رسول (1382). مقدمهای بر کنترل آماری فرایند، چاپ هشتم، انتشارات دانشگاه علم و صنعت ایران.